Trench Excavation and Base Preparation (Day 01 Continued)
0:54
12:16
8.4K views
At 0:54 in
Can they BUILD the wall in time!
What happens here
The crew begins the laborious task of digging a trench along the sidewalk where the new retaining wall will be built. This involves using shovels to excavate the soil and move it to a designated spoil pile. Once the trench is dug to the correct depth, it is filled with gravel, which will serve as a stable base for the retaining wall blocks. The gravel is then compacted using a plate compactor to create a firm and level foundation. The end of the first day shows the trench filled with compacted gravel, ready for the blocks.
Goal: Dig the retaining wall trench, add and compact gravel base.
Tools and materials
- Plate Compactor — Compacting the gravel base for the retaining wall
- Shovels — Digging the trench and moving soil
- Wheelbarrow — Transporting excavated soil and gravel
- Gravel — Creating a stable base for the retaining wall
What they say
(1,050 characters)Hide