Rough Grading and Wall Completion (Day 03)
At 7:05 in
Can they BUILD the wall in time!
What happens here
On Day 3, the crew focuses on grading the rest of the yard, ensuring it slopes correctly away from the house and towards the street. This involves rough-grading the soil using a combination of hand tools and possibly a mini-excavator or skid steer with a hydro bucket for larger areas if available (though it caused delays in the video). The existing soil is moved and smoothed to create the desired drainage patterns. The retaining wall is further built up and secured. Concrete chunks unearthed during excavation are removed. The primary goal is to establish the proper contours of the yard before adding new landscaping elements.
Goal: Complete rough grading of the yard and finish building the retaining wall.
Tools and materials
- Hydro Bucket — Moving large amounts of dirt for grading
- Levels — Ensuring proper slope and block alignment
- Rakes — Leveling and smoothing soil
- Retaining Wall Blocks — Building the retaining wall
- Shovels — Moving and shaping soil
- Wheelbarrow — Transporting debris and materials
- Concrete Chunks — Debris removal from excavation