Skip to main content

Remove Baseboard and Install Vertical Studs

2:09
18:58
177.2K views

At 2:09 in

Building My Dream Bedroom Media Center

What happens here

The first step in assembling the new wall structure is to remove the existing baseboard where the new structure will be built. A scrap piece of wood with a 90-degree angle is used as a guide to score a clean cut along the baseboard using a utility knife before prying it off. Next, the pre-drilled 2x8 vertical studs are positioned against the wall, aligned with a laser level, and secured using 2.5-inch pocket hole screws. This creates the main framework for the protruding media console.

Goal: Carefully remove the existing baseboard and then secure the prepared vertical 2x8 studs to the wall using pocket screws, ensuring they are level and aligned.

Tools and materials

  • 2.5-inch Pocket Hole Screws
  • Cordless Drill Ryobi
  • Laser Level
  • Pry Bar / Hammer
  • Scrap Wood Block
  • Stepladder Werner
  • Utility Knife

What they say

Hide

to remove this base board uh if you want to make a nice clean cut a trick just to use a scrap piece that has a nice 90 degree angle place it flush there and then use this as a guide to run your blade against and it'll make a nice clean straight cut

Auto-generated from the video audio.