Prepare Site and Establish Base
At 0:00 in
Building a terraced retaining wall- start to finish.
What happens here
Begin by excavating the sl sloped area alongside the building, creating a level trench that will accommodate the retaining wall. This initial excavation removes existing soil and prepares a stable foundation. Once the trench is ready, a skid steer is used to dump a layer of angular drainage gravel into the trench. Workers then manually spread and level this gravel, ensuring a consistent depth and even surface for the first course of blocks. The gravel provides crucial drainage and a stable, permeable base.
Goal: Excavate the sloped area adjacent to the building to create a trench for the retaining wall base, then add and compact a layer of gravel to serve as the foundation.
Tools and materials
- Leveling Pole/Stick
- Rake
- Retaining Wall Blocks (Base Course)
- Shovels
- Skid Steer
- Angular Drainage Gravel
What they say
(119 characters)Hide
What they say
(119 characters)Auto-generated from the video audio.