At 0:00 in

Building a terraced retaining wall- start to finish.

What happens here

Begin by excavating the sl sloped area alongside the building, creating a level trench that will accommodate the retaining wall. This initial excavation removes existing soil and prepares a stable foundation. Once the trench is ready, a skid steer is used to dump a layer of angular drainage gravel into the trench. Workers then manually spread and level this gravel, ensuring a consistent depth and even surface for the first course of blocks. The gravel provides crucial drainage and a stable, permeable base.

Goal: Excavate the sloped area adjacent to the building to create a trench for the retaining wall base, then add and compact a layer of gravel to serve as the foundation.

Tools and materials

  • Leveling Pole/Stick
  • Rake
  • Retaining Wall Blocks (Base Course)
  • Shovels
  • Skid Steer
  • Angular Drainage Gravel