Skip to main content

Backfill and Compact Wall Layers

6:24
12:47
12.3K views

At 6:24 in

Building a terraced retaining wall- start to finish.

What happens here

As blocks are laid, gravel is added to the excavated area behind the retaining wall. A plate compactor is then used to densely pack this gravel. This process is repeated for each course of blocks (though only shown for the lower courses in this video segment) to ensure proper drainage and stability, preventing the buildup of hydrostatic pressure that could compromise the wall.

Goal: After laying each course of retaining wall blocks, backfill the area immediately behind the wall with drainage gravel and compact it thoroughly. This prevents hydrostatic pressure buildup and ensures wall stability.

Tools and materials

  • Plate Compactor
  • Shovels
  • Drainage Gravel