Perform a comprehensive final inspection of the newly constructed retaining wall and the surrounding graded landscape. Verify that the wall is level, secure, and aesthetically pleasing. Check the drainage path to ensure water will properly flow away from the foundation. Once satisfied with the quality of work, the heavy construction equipment, including the skid steer and dump truck, is carefully loaded onto trailers and transported off-site. This marks the official completion of the retaining wall project.
Goal: Conduct a thorough final inspection of the completed retaining wall and graded area, then ensure all heavy equipment is safely removed from the site, signifying project completion.