Skip to main content

Installing Ramp Storage and Side Panels

8:42
21:23
1M views

At 8:42 in

Building a Dump Trailer by hand-Start to Finish FULL time lapse

What happens here

Miguel welds the internal structures that will form the storage pockets for the trailer ramps, ensuring they are integrated seamlessly into the frame. Following this, the large, pre-formed side panels of the dump body are carefully positioned and tack welded into place. Internal reinforcing brackets and gussets are also added and tack welded to enhance the structural rigidity of the dump body. The workers move between working on the exterior and interior of the trailer box.

Goal: This stage involves welding in the ramp storage pockets, forming the main sides of the dump body, and tack welding internal reinforcements.

Tools and materials

  • Hammer
  • MIG Welder
  • Safety Glasses
  • Welding Gloves
  • Welding Helmet
  • Dump Body Side Panels
  • Internal Reinforcements
  • Ramp Storage Pockets

What they say

Hide

guys meet miguel he's worked at texas pride trailers for over 17 years and this isn't the first dump trailer he's built but he's still got to get the pockets to store the ramps put in place uh [Music] the floor of the dump trailer gets slid into place and temporarily tacked off the uprights that will hold the dump gator next to be put into position while the gate is being cut and formed the forklift operator grabs the hitch and gets that ready to go the side panels of the dump body are put into place [Music] oh [Music]

Auto-generated from the video audio.