Skip to main content

Assembling Frame and Crossmembers

2:41
21:23
1M views

At 2:41 in

Building a Dump Trailer by hand-Start to Finish FULL time lapse

What happens here

Workers manually position the long frame members on sturdy sawhorse-style stands. They then measure, plasma cut, and grind additional crossmembers that will form the internal support structure of the trailer. These crossmembers are carefully placed and MIG welded to tie the main frame components together, forming a robust and boxed-out chassis. This step also involves welding smaller brackets that will secure the trailer's electrical wiring.

Goal: The team meticulously positions and welds the main frame members and internal crossmembers, ensuring the structural integrity and stability of the trailer chassis.

Tools and materials

  • Angle Grinder
  • Measuring Tape
  • Plasma Cutter
  • Safety Glasses
  • Welding Gloves
  • Welding Helmet
  • Crossmembers
  • Long Frame Members
  • Wiring Brackets

What they say

Hide

it out and get ready to hang the suspension [Music] flash warning coming up in three two one the brackets that will hold the trailer wiring in place are the next thing to be welded onto the frame [Music] miguel and marvin move into their next step which is boxing out the frame and tying everything together and that means they've got to get the cross members in place [Applause] [Music] i don't see marvin and miguel breaking out the tape measure very often on this build and especially at times when i would have probably measured three or four times and still gotten it wrong these guys don't even pull it out the next step is to hang the suspension [Applause]

Auto-generated from the video audio.