Skip to main content

Attaching Front and Floor Sections

7:09
21:23
1M views

At 7:09 in

Building a Dump Trailer by hand-Start to Finish FULL time lapse

What happens here

A forklift carefully delivers large flat steel sheets that will become the front and floor of the dump body. Workers maneuver these heavy sheets into precise positions on the trailer frame. Once aligned, they use MIG welders to tack weld the sheets in place, ensuring a secure and flush fit. The floor is constructed from multiple sheets, which are also tack welded together and to the supporting crossmembers.

Goal: Large metal sheets are meticulously positioned and welded to form the trailer's front and floor sections, with continuous tack welding to secure the large panels.

Tools and materials

  • Forklift
  • MIG Welder
  • Safety Glasses
  • Welding Gloves
  • Welding Helmet
  • Floor Metal Panels
  • Front Metal Panel

What they say

Hide

the front and floor of the trailer are the next things to get installed [Music] the rest of the dump beds cross members are next to get knowledge everything gets tacked first and then gone through and fully welded later on [Music]

Auto-generated from the video audio.