Complete Foundation Footings Excavation
At 13:45 in
Building a Cabin in the woods (Ep.1)
What happens here
The excavation for the foundation footings is now complete. The architects and engineers provided new plans requiring the footings to extend 36 inches past the frost line. This resulted in a very deep and aggressive pit. The final depth accounts for an 8-inch footing, a stem wall that extends 36 inches above that, and additional height above grade to ensure water slopes away from the foundation. The large scale of the excavation is noted as both intimidating and exciting, marking a major milestone in the project.
Goal: The excavation for the cabin's foundation footings is completed, ensuring the necessary depth (36 inches past the frost line) and proper grading for water drainage.
Tools and materials
- Excavator
- Measurement Tools