Address Site Challenges & Redesign
At 7:21 in
Building a Cabin in the woods (Ep.1)
What happens here
During excavation, two significant issues arose: the initial driveway was too steep for winter conditions (requiring 4-low in a truck), and the septic drain field did not meet regulations. The septic field needed to be 20 feet away from the road, conflicting with the natural hillside supporting the house foundation. To resolve this without cutting down excess trees, a new plan was devised: the first drain line would run across the property, and the second line would be routed to avoid a tree. Additionally, the patio area would be extended by 4 feet, and a flat parking pad created at the base of the driveway for easier vehicle maneuverability during winter months. This decision was made to ensure safety and preserve the natural wooded environment.
Goal: Encountered and addressed several site-specific problems, including a steep driveway and a non-compliant septic drain field, requiring a redesign of the site layout to avoid unnecessary tree removal and ensure functionality.
Tools and materials
- Excavator
- Site Markers
What they say
(2,499 characters)Hide
What they say
(2,499 characters)Auto-generated from the video audio.