Final Assembly and Inspection
18:20
22:22
6.9K views
At 18:20 in
Backup Emergency HEAT
What happens here
After all interior and exterior flue components are installed, connect any remaining interior pipe sections, ensuring they are securely fastened. Double-check all connections to ensure they are tight and properly sealed. Confirm that the exterior heat shields are flush against the wall and the caps are correctly oriented. The pellet stove is now ready for use once pellets are loaded.
Goal: Complete all connections and verify the proper installation of the pellet stove.
Tools and materials
- Double-Walled Flue Pipes — Final connections
- Exterior Pipe Caps — Final inspection for proper orientation
- Wood Pellets — Fuel for the pellet stove