Skip to main content

Set Up Concrete Formwork

0:00
0:33
27.6K views

At 0:00 in

Almost ready to pour the slab!! #building

What happens here

The initial part of the video shows workers setting up wooden form boards around the perimeter of the area designated for the concrete patio. These boards are typically 2x4s or 2x6s, held in place by wooden stakes driven into the ground. They are carefully leveled and squared to ensure the concrete slab will have straight edges and the correct dimensions and slope. This step establishes the boundaries for the concrete pour.

Goal: Define the perimeter and create the mold for the concrete patio slab.

Tools and materials

  • Cordless Drill/Driver — Driving screws if used for securing forms
  • Hammer — Driving wooden stakes into the ground
  • Level — Ensuring the forms are set at the correct grade or level
  • Screws/Nails — Securing overlapping form boards or attaching cleats for stability
  • String Line — Establishing straight lines and alignment for the forms
  • Tape Measure — Measuring and ensuring correct dimensions and spacing of forms
  • Wooden Form Boards — Creating the outer perimeter and shape of the concrete slab
  • Wooden Stakes — Holding the form boards securely in place