Install and Compact Sub-base Material

0:24
0:40
2K views

At 0:24 in

a whoooooole front facelift. Brand new paver driveway, paver walkway, front courtyard area.

What happens here

Following the excavation, uniformly spread a layer of crushed stone (or similar suitable sub-base material) over the entire prepared subgrade for the driveway, walkway, and courtyard. The thickness of this layer is critical, typically ranging from 4 to 12 inches, with driveways requiring a thicker base due to heavier traffic. Use the mini skid steer or shovels to efficiently distribute the material. Compact the sub-base thoroughly in lifts (layers) of 2-4 inches using a vibratory plate compactor. Each lift must be compacted until it is firm, stable, and exhibits no discernible movement or soft spots.

Goal: Create a stable and well-drained foundation

Tools and materials

  • Crushed Stone — Forming the structural and load-bearing base layer beneath the pavers
  • Measuring Tape — Verifying the thickness of the compacted sub-base layers
  • Mini Skid Steer Ditch Witch — Efficiently spreading large quantities of sub-base material over the project area
  • Rakes — Distributing and roughly leveling the sub-base material
  • Shovels — Spreading and leveling the sub-base material
  • String Line and Stakes — Ensuring consistent depth of the sub-base material across the entire project
  • Vibratory Plate Compactor — Compacting the sub-base material and later the pavers themselves to create a dense, stable surface
  • Wheelbarrow — Transporting smaller amounts of sub-base material to specific areas