Skip to main content

Demolition of Existing Hardscaping

0:06
0:40
2K views

At 0:06 in

a whoooooole front facelift. Brand new paver driveway, paver walkway, front courtyard area.

What happens here

The existing concrete driveway and walkway must be completely removed to make way for the new paver installations. This involves breaking up the concrete, which can be accomplished using a mini skid steer equipped with a hydraulic hammer attachment for efficiency, or manually with sledgehammers and jackhammers for smaller sections. Once the concrete is broken into manageable pieces, load the debris into dump trucks for proper disposal off-site. Clearing the area effectively is a critical prerequisite for the new hardscaping design.

Goal: Clear the project area

Tools and materials

  • Concrete Saw — Making precise cuts in concrete before breaking, especially for clean edges
  • Dump Trucks — Hauling away concrete debris and other waste materials
  • Hearing Protection — Protecting ears from loud noise produced by demolition equipment
  • Heavy-duty Gloves — Protecting hands from sharp edges and vibrations
  • Hydraulic Hammer Attachment — Attaching to the mini skid steer to rapidly break up concrete
  • Jackhammer — Breaking up concrete in areas where heavy machinery cannot access or for smaller jobs
  • Mini Skid Steer Ditch Witch — Breaking and moving large pieces of concrete efficiently
  • Safety Glasses — Protecting eyes from flying debris during demolition
  • Sledgehammer — Manually breaking smaller sections of concrete or for fine demolition work
  • Steel-toed Boots — Protecting feet from falling debris and heavy equipment