Perform Initial Trenching & Discover First Utility Line
At 2:11 in
A new way of Digging
What happens here
Begin the hydro-excavation process by using the EGO pressure washer to direct a focused stream of water into the ground. This will effectively loosen the compacted clay and material, especially from the old driveway. Once the soil is sufficiently saturated and loosened into a slurry, use the Hydrovac 2's hose to vacuum up the muddy mixture into the attached Steel Jackson wheelbarrow. Continue this process carefully, slowly extending the trench and exposing any buried lines. The first line discovered during this initial trenching is an electrical line, identified as the power supply for a hot tub.
Goal: Excavate the first section of the trench and locate any initial buried utility lines.
Tools and materials
- EGO Pressure Washer EGO — Loosening compacted soil
- RNV Hydrovac 2 RNV — Suctioning muddy water and excavated material
- Steel Jackson Wheelbarrow Jackson — Collecting the slurry
What they say
(2,491 characters)Hide
What they say
(2,491 characters)Auto-generated from the video audio.