Final Confirmation of All Lines & Project Wrap-Up
20:25
26:49
19.5K views
At 20:25 in
A new way of Digging
What happens here
After the break, the team performs a final check of the excavated trench using divining rods to confirm no additional lines were missed. The trench now clearly exposes the hot tub electrical line, the gas line (yellow pipe), and other buried cables (phone and power for the barn). The depth is verified to be sufficient for the planned pond. The host gives a final walk-through of the now safe and prepared excavation area, concluding the utility locating project and preparing for the main pond digging to begin.
Goal: Verify all utility lines are located and the site is fully prepared for pond excavation.
Tools and materials
- Divining Rods — Performing final verification of all utility line locations
What they say
(2,499 characters)Hide
What they say
(2,499 characters)Auto-generated from the video audio.