Ground Compaction and Sub-Base Preparation
1:09
18:56
48.2K views
At 1:09 in
$5000 job in a day part 3
What happens here
After placing the boulders, prepare the ground for proper drainage and compaction. First, manually remove any remaining debris or small rocks from the ground surface. Then, spread the soil evenly to fill any gaps or low spots. Use a jumping jack compactor to firmly compact the soil, ensuring a stable and level base, especially in areas that will support heavy installations like an air conditioner unit. This process creates a solid foundation and prevents future settling.
Goal: Achieve a stable and level compacted ground surface.
Tools and materials
- Rake — Refining soil level
- Shovel — Spreading and leveling soil
- Soil Local — Leveling and compacting the ground
What they say
(270 characters)Hide
What they say
(270 characters)Auto-generated from the video audio.