Layering and Compacting Backfill Material
At 0:16 in
5 main causes Retaining walls fail.
What happens here
As the retaining wall blocks are laid course by course, the area behind the wall is filled with backfill material. This material is typically soil or a mixture of soil and aggregate, brought in by an excavator and spread manually by workers using shovels and rakes. Each layer, or 'lift,' of backfill should be relatively thin (e.g., 4-6 inches) to allow for effective compaction. A plate compactor (such as the Bomag model shown) is then used to mechanically compact each lift. This process is repeated: lay a course of blocks, spread a thin layer of backfill, compact, then lay the next course of blocks. In areas where geotextile fabric or geogrid has been placed, the fabric is folded over or the geogrid extended into the backfill layer before compaction, integrating it into the reinforced soil mass. This cyclical process ensures the backfill is dense and stable, minimizing future settlement and pressure on the wall.
Goal: This step focuses on systematically adding backfill material in thin lifts behind the retaining wall and compacting each layer using mechanical tools to achieve maximum density and stability.
Tools and materials
- Excavator/Skid Steer
- Geogrid
- Plate Compactor (e.g
- Bomag)
- Retaining Wall Blocks
- Shovels and Rakes
- Backfill Soil
What they say
(705 characters)Hide
What they say
(705 characters)Auto-generated from the video audio.