Initial Retaining Wall Construction and Base Preparation
At 0:00 in
5 main causes Retaining walls fail.
What happens here
The work begins with substantial excavation of the hillside where the retaining wall is to be constructed. Heavy machinery, such as a skid steer and mini-excavator (like the Bobcat 331), is used to move large quantities of soil and create the trench for the wall's foundation. Workers manually shovel and spread gravel (drainage aggregate) to establish a stable and level base for the first course of retaining wall blocks. The initial courses of blocks are carefully placed, ensuring they are level and properly aligned to form the curved structure of the wall. Perforated drain pipes are also laid behind the initial blocks to manage water drainage. Geogrid material is then spread behind the blocks, extending back into the excavated area, to provide reinforcement for the soil layers that will be compacted behind the wall. A plate compactor is visible and used throughout this initial phase to compact the gravel base, providing a solid foundation for the blocks.
Goal: The initial phase of retaining wall construction involves excavating the area, preparing a level base, laying the first courses of blocks, and establishing foundational drainage, all while preparing for subsequent backfilling and compaction.
Tools and materials
- Geogrid
- Mini-Excavator (e.g
- Bobcat 331)
- Perforated Drain Pipe
- Plate Compactor (e.g
- Bomag)
- Rubber Mallet / Hammer
- Shovels and Rakes
- Skid Steer
- Spirit Level