Continuous Backfilling and Compaction to Final Height
At 1:04 in
5 main causes Retaining walls fail.
What happens here
The construction continues in a repetitive sequence: laying another course of retaining wall blocks, extending the geogrid reinforcement if required by engineering specifications, placing drainage aggregate immediately behind the blocks, and then filling the remaining area with backfill soil. Crucially, each thin lift of drainage aggregate and soil is thoroughly compacted using the plate compactor. The excavator continues to supply materials, while workers use manual tools to spread and level. The presenter emphasizes that for walls exceeding 4 feet in height, or those with additional weight (surcharge) from structures or slopes behind them, engineering and the use of geogrid are critical. This continuous process of layering and compaction is fundamental to the long-term success and stability of the retaining wall, ensuring that the soil behind it can withstand pressure and resist movement, even if the block face were to be removed.
Goal: This ongoing process involves systematically adding blocks, geogrid, drainage aggregate, and backfill in layers, ensuring meticulous compaction of each lift until the retaining wall reaches its final desired height and stability.
Tools and materials
- Excavator/Skid Steer
- Geogrid
- Plate Compactor
- Retaining Wall Blocks
- Shovels and Rakes
- Backfill Soil
What they say