Implement Alternative Tie-Down (One Chain, Two Binders)
At 3:47 in
3 ways I chain down equipment.
What happens here
For situations where fewer chains or binders are available, the presenter demonstrates an alternative method: running a single chain underneath the equipment, through a secure anchor point on the machine, and connecting both ends to separate load binders on the trailer. He loops the chain under the Bobcat S185, attaches one end to a trailer rub rail with a binder, then brings the other end to the opposite side of the trailer for a second binder connection. This creates a V-shape, pulling the equipment down and forward.
Goal: Learn an alternative tie-down strategy using one long chain looped under the equipment and secured with two separate load binders to the trailer.
Tools and materials
- Lever Load Binders
- Long Load Chain
What they say
(648 characters)Hide
What they say
(648 characters)Auto-generated from the video audio.