Skip to main content

Attach First Chain (Four-Point Method)

0:46
10:43
63.9K views

At 0:46 in

3 ways I chain down equipment.

What happens here

The presenter demonstrates the 'four-point tie-down' method. He attaches one end of a chain to a designated anchor point on the Bobcat S185 skid steer, specifically hooking it to a secure hole in the machine's frame near the rear tire. He then pulls the chain to the side and forward, preparing to connect it to an anchor point on the trailer and a load binder.

Goal: Attach one end of the chain to the equipment's rear anchor point, running it towards a trailer anchor point to begin the four-point tie-down.

Tools and materials

  • Load Chain

What they say

Hide

you guys the least amount of trouble it may not be the fastest way but it's called a four point tie down and a four point should get you through most inspections

Auto-generated from the video audio.