Skip to main content

Final Leak Check Under Sink — Test the Repair

Intermediate

Part of project

How to Replace a Cracked Section of Cast Iron Drain Pipe with PVC · Step 9 of 10

Helpful?

In this video

After confirming the repair is successful at the spout, perform a final check for leaks underneath the sink. Because the area was likely wet from the previous leak, use a dry rag or paper towel to wipe down the faucet body, supply lines, and the bottom of the sink cabinet completely. Feel around the base of the faucet from underneath for any new moisture. As an extra precaution, leave a dry paper towel under the sink and check it the next day to be certain there are no slow drips.

Goal: Ensure no water is leaking down into the sink cabinet.

Used in this video

  • Rag (Material: Cotton)Drying the area under the sink for leak detection.
477.0K views9511 minute
Roger Wakefield Plumbing Education

672K subscribers

View Channel

FAQs

What are the main safety concerns when cutting cast iron pipe, and what PPE should I use?

Cutting cast iron creates heavy dust and sharp shards. Always wear a respirator, safety glasses or goggles, heavy-duty work gloves, and long sleeves to protect against debris and cuts. Ensure the area is well-ventilated.

Is a standard hacksaw sufficient for cutting cast iron, or should I use a different tool for efficiency?

While a hacksaw is listed and can eventually cut cast iron, it is very labor-intensive. For significantly easier and faster cuts, consider renting or purchasing a reciprocating saw with a metal-cutting blade or a specialized cast iron snap cutter.

How can I prevent leaks when connecting the new PVC pipe to the existing cast iron with shielded couplings?

Precise measurement and clean, burr-free pipe ends are crucial. Use the specified shielded no-hub couplings and ensure they are torqued exactly to the manufacturer's recommendations using a torque wrench. Over- or under-tightening can lead to leaks.

How long should I expect this project to take for an intermediate DIYer, and what's the most challenging aspect?

This project typically takes 4-8 hours, depending on access and your experience level. The most challenging parts are safely cutting the heavy cast iron pipe and ensuring the existing pipe is adequately supported to prevent collapse or further damage.