Loading...
Carefully move the new, fully assembled pressure tank into its final position. Align the tank tee with the main water line coming from the pump. Reconnect the plumbing. If using threaded connections, apply Teflon tape and pipe dope. If using PVC, clean the pipe end and the fitting with PVC primer, then apply a liberal amount of PVC cement and push the two pieces together with a quarter-turn, holding for 30 seconds. Ensure the tank is stable and level on its base.
This guide provides comprehensive, step-by-step instructions for safely removing an old well pressure tank and installing a new one. The process includes de-energizing the system, draining the water, disconnecting plumbing and electrical components, preparing the new tank with the correct air pre-charge, installing new fittings, and testing the system for leaks and proper operation.
Absolutely always turn off the power to your well pump at the main electrical panel first. Then, fully drain the entire water system to relieve all pressure. This prevents electric shock, water damage, and injury from pressurized components.
For a beginner, plan for 2-4 hours, assuming you have all tools and materials ready. The material cost, primarily for the new pressure tank and fittings, can range from $200 to $600, depending on the tank size and brand, plus a few dollars for tape and rags.
Pre-charging with air prevents the tank from becoming 'waterlogged' and ensures your pump cycles efficiently, extending its lifespan. Set the tank's air pressure (when empty) to 2 PSI below your well pump's 'cut-in' pressure (the pressure at which your pump turns on).
You'll definitely need a sturdy pipe wrench (like the 16-inch self-adjusting one mentioned) for plumbing connections, a tire pressure gauge to check the tank's pre-charge, and a water pressure gauge to monitor system pressure. Slip-joint pliers are also very helpful for various fittings.
Start your project
chat with your ai