After the installation is complete and the cement has had time to cure per the manufacturer's instructions, slowly turn the water back on and check for leaks. Once confirmed to be watertight, place a protective valve box over the entire assembly. Position the box so that it is level and provides clear access to the valve handle and the PRV adjustment screw. Place the lid securely on top of the valve box to finish the job before backfilling the trench with soil.

Goal: Protect the New Valve Assembly

  • Ensure the valve box is set at the proper grade so the lid will be flush with the ground once the area is backfilled.

Used in this video

  • Valve BoxProtecting the valve assembly from dirt and providing access for future maintenance.
48.7K views1.5K5 minutes
The Plumbers Plunger

201K subscribers

View Channel

FAQs

Is installing a backwater valve a feasible DIY project, or should I hire a professional plumber?

This is an intermediate-level project requiring significant physical labor, specialized tools (like a concrete saw or a heavy-duty sledgehammer for breaking concrete), and a good understanding of plumbing codes and concrete work. While possible for experienced DIYers, if you're not comfortable with breaking concrete, excavating near sewage lines, or ensuring proper slope and sealing, it's highly advisable to consult a licensed plumber. Improper installation can lead to leaks, blockages, or failure to prevent backups.

What permits or inspections are typically required before starting this kind of major plumbing work?

Absolutely, permits are almost always required for altering your main sewer line. You'll need to contact your local municipal building department or plumbing authority to understand their specific requirements for plumbing and excavation permits. Failing to obtain permits can lead to fines, stop-work orders, or requiring you to remove and reinstall the work if it doesn't meet code. Plan for inspections at various stages, such as after excavation and after the valve installation but before backfilling.

What are the most critical safety precautions I should take when breaking concrete and working with sewer lines?

When breaking concrete, always wear safety glasses, hearing protection, work gloves, and steel-toed boots. For working with sewer lines, always wear impermeable gloves (like nitrile or rubber) and a mask to protect against biohazards and odors. Ensure proper ventilation in the work area. Be extremely cautious of other utility lines (water, gas, electrical) that might run through the concrete slab; call 811 before you dig to mark utilities.

What size backwater valve do I need, and are there different types or brands I should consider?

The valve size must match your existing main drain pipe, which is typically 3-inch or 4-inch PVC in residential homes (e.g., Oatey 3 in. or 6 in. valves are listed as materials). Visually inspect your drain pipe to confirm its diameter before purchasing. There are two main types: normally open (most common, stays open until activated by backpressure) and normally closed (requires manual opening for regular flow); ensure the valve you choose is suitable for your application and approved by local plumbing codes.