Skip to main content

Assemble and Glue Drain Plumbing — Connect the Drain Plumbing

Intermediate12 hours

Part of project

How to Install and Level a Shower Pan Base · Step 7 of 8

Helpful?

In this video

With the holes drilled, perform one final dry fit of the entire drain assembly from the outlet box down through the floor plate. Use a marker to draw alignment lines across the fittings and pipes so you can quickly reassemble them correctly. Disassemble the components. Apply PVC primer followed by PVC cement to each fitting and pipe, then firmly push them together, twisting slightly to ensure a good seal and aligning your marks. Glue the pieces in a logical sequence, starting with the connections to the main drain and working up to the final connection at the washer box.

Goal: Install the drain, P-trap, and vent stack

  • Using a marker to create alignment lines during the dry-fit stage is crucial for ensuring the pipes are correctly oriented when gluing them together.

Used in this video

  • Marker (brand: none, Tool Type: Hand Tools, Power Source: Manual)Creating alignment marks on the PVC pipes and fittings during the dry-fit phase.
117.2K views2.0K25 minutes
The Home Depot

623K subscribers

View Channel

FAQs

Before installing the shower pan, how thoroughly do I need to prepare my subfloor, and what should I look out for?

Ensure the subfloor is clean, dry, and structurally sound. Check for rot, water damage, or uneven spots, repairing them as needed to provide a stable foundation for the mortar bed. A smooth, level subfloor is crucial for the pan's stability and proper drainage.

What's the right consistency for the mortar bed, and how much do I need to mix for a standard shower pan?

The mortar (like SAKRETE 80 lb. Gray Type S Mortar Mix) should be mixed to a thick, peanut butter-like consistency, allowing it to hold its shape without being too wet or crumbly. For a typical 48x32 inch pan, one 80lb bag should be sufficient, but always check the pan manufacturer's recommendations. Ensure even coverage to fully support the pan.

Beyond just using a level, what are the key steps to ensure my shower pan is perfectly level and stable?

Dry-fit the pan multiple times, checking with a long level in all directions (front-to-back and side-to-side). Once in the mortar, apply even pressure and re-check constantly, making micro-adjustments by lightly tapping high spots or adding mortar to low spots if necessary. Ensure the pan has full, even contact with the mortar for stability and proper drainage towards the drain.

What are the critical steps for correctly installing and sealing the drain assembly to prevent leaks?

Apply a generous bead of plumber's putty (like Oatey 9 oz. Stain-Free Plumber's Putty) around the drain flange before seating it firmly into the pan opening. Hand-tighten the nuts from underneath first, then use Channellock pliers for a final snug turn, being careful not to overtighten and crack the pan. Always perform a water test for leaks before proceeding.