Skip to main content

Create Access Panel in Ceiling — Access the Ceiling Cavity: Preparation is Key

Intermediate

Part of project

Ceiling Rain Shower Installation: A Comprehensive DIY Guide · Step 2 of 5

Helpful?

In this video

To begin the repair, lay down a protective plastic sheet to catch debris. Then, use a reciprocating saw to carefully cut an access hole in the ceiling directly below the bathtub's drain assembly. Use a flashlight to illuminate and inspect the leaking pipes and surrounding structure.

Goal: Expose the leaking bathtub drain plumbing for repair.

  • Be aware of potential hazardous materials like asbestos in older ceilings and plumbing. Wear appropriate personal protective equipment (PPE) such as a respirator.

Used in this video

  • Reciprocating Saw (brand: Milwaukee, Tool Type: Reciprocating Saw, Power Source: Battery)Cutting an access hole in the drywall ceiling.
  • Flashlight (Flashlight_Type: Handheld)Inspecting the plumbing inside the dark ceiling cavity.
4.4M views171.6K15-30 minutes
LRN2DIY

1.0M subscribers

View Channel

FAQs

What specialized tools and skills are essential for extending the water supply and installing the new plumbing lines for a ceiling shower?

You'll definitely need a copper pipe tubing cutter and a butane detail torch for soldering the new copper lines. Proficiency in soldering copper pipes is crucial for creating secure, leak-free connections, so practice on scrap pieces if you're new to it. An adjustable wrench is also vital for tightening fittings.

What critical safety precautions should I prioritize, especially when working with water and in the ceiling cavity?

Always turn off the main water supply to your house before starting any plumbing work to prevent flooding. When working in the ceiling, wear eye protection and a dust mask. If there's any electrical wiring near your work area, ensure power to those circuits is off as well to prevent electric shock.

Given the 'intermediate' difficulty, how much time should I realistically allocate for this project, and what are the main cost drivers?

Realistically, plan for at least 1-2 full days for the plumbing and installation, plus additional time for ceiling repair and finishing. The main cost drivers will be the new rain shower head itself, copper piping and fittings, and materials for drywall repair like the Prest-on Drywall Repair Kit and joint compound.

What are the most common plumbing mistakes DIYers make during this installation, and how can I ensure my connections are leak-free?

Common mistakes include improper soldering, not applying enough Teflon tape to threaded connections, or failing to properly secure pipes. To ensure leak-free connections, clean and flux all copper joints thoroughly before soldering, and apply Teflon tape clockwise to all threaded fittings. Always pressurize the new lines and inspect for leaks before closing up the ceiling.

Transcript
Hide

Yo, jobs like these I hate with the passion. Look at how nasty this shit is bro, that's like a hundred year old cement mixed with those bestas in a side of lead, basically a full course meal of future health problems. But fuck it, we got no choice. Sometimes we have to do these jobs, especially when it's for a good management that keeps you busy.

Auto-generated transcript. May contain errors.