Skip to main content

Prepare and Drain the Pipe — Drain Remaining Water from the Line

Beginner3 hours

Part of project

How to Replace an Outdoor Spigot Faucet: A Step-by-Step Guide · Step 2 of 6

Helpful?

In this video

Before starting any work, ensure the water supply to the pipe is shut off. Place a bucket underneath the saddle valve to catch any residual water. Open the valve by turning the handle counter-clockwise to allow the water in the line to drain out into the bucket.

Goal: Drain Water

  • Failure to turn off the water supply will result in uncontrolled water flow when you cut the pipe.

Used in this video

  • Bucket (brand: Unspecified, Tool Type: Hand tools, Size/Capacity: Medium)Catching water drained from the pipe.
96.2K views945 minutes
Lowe's Home Improvement

1.3M subscribers

View Channel

FAQs

What's the most important safety step when replacing an outdoor spigot?

The absolute most critical step is to completely turn off the main water supply to the spigot or your entire home before starting. This prevents unexpected water flow and potential flooding. Always confirm the water is off by opening the existing spigot and waiting for the water to stop flowing.

Do I need all the specific tools listed, or are there acceptable alternatives for a beginner?

While specific brands are listed, the core tools needed are an adjustable wrench (or two for counter-tightening), a screwdriver, and crucially, Teflon tape. The '30 in. Steel Sprinkler Valve Key' is only essential if your shut-off valve is deep underground or in a box; otherwise, a standard valve can be turned with a regular wrench. Always ensure your wrenches fit the spigot nuts securely to prevent stripping.

My new spigot is still leaking after installation. What should I check first?

First, ensure you applied Teflon tape correctly, wrapping it clockwise 3-5 times around the threads of the new spigot. Then, check that all connections are securely tightened, but avoid overtightening which can strip threads. A slight leak often indicates insufficient tape or a connection that needs a little more snugging with your wrench.

Is 3 hours a realistic estimate for a beginner, or can this project be done faster?

Three hours is a generous and realistic estimate for a beginner, accounting for locating the shut-off valve, gathering tools, and carefully performing each step. An experienced DIYer might complete it in under an hour. Taking your time reduces the chance of mistakes, like leaks, which would require more time for troubleshooting later.