Integrate and Test the Drawer Assembly — Insert Drawers and Test Operation
Part of project
How to Build Pull-Out Drawers Under Stairs · Step 9 of 10
In this video
Once the cabinet-side slide members are securely installed, take the completed drawer box (which should have its corresponding drawer-side slide members already attached). Carefully align the drawer-side slides with the cabinet-side slides and gently push the drawer into the cabinet until it engages the slide mechanism. With the drawer inserted, test its operation by pulling it open and pushing it closed several times. Observe the partial-extension feature, where a portion of the drawer box remains inside the cabinet, ensuring smooth movement without binding or catching. Make any necessary fine adjustments to the slide alignment if the drawer does not operate smoothly.
Integrate and Test the Drawer Assembly — Insert Drawers and Test Operation
Part of project
How to Build Pull-Out Drawers Under Stairs · Step 9 of 10
In this video
Once the cabinet-side slide members are securely installed, take the completed drawer box (which should have its corresponding drawer-side slide members already attached). Carefully align the drawer-side slides with the cabinet-side slides and gently push the drawer into the cabinet until it engages the slide mechanism. With the drawer inserted, test its operation by pulling it open and pushing it closed several times. Observe the partial-extension feature, where a portion of the drawer box remains inside the cabinet, ensuring smooth movement without binding or catching. Make any necessary fine adjustments to the slide alignment if the drawer does not operate smoothly.