Re-lay and Level Pavers — Re-level and Set Pavers
Part of project
How to Level a Sinking Paver Step · Step 3 of 4
In this video
Begin re-laying the pavers on top of the permeable fabric and a fresh layer of leveling sand. As you lay the pavers, adjust the sand beneath them as needed to achieve the desired height and level. The narrator points out that the pavers should be set approximately 1/4 inch high before compaction, as they will settle flush once tamped down. For areas that are too low, add more sand. Use a wood block and a hammer to gently tap pavers into place and achieve a level surface without damaging the pavers directly. This iterative process of laying, checking level, adjusting sand, and tapping is key to a stable and even patio.
TranscriptHide
Auto-generated transcript. May contain errors.
Re-lay and Level Pavers — Re-level and Set Pavers
Part of project
How to Level a Sinking Paver Step · Step 3 of 4
In this video
Begin re-laying the pavers on top of the permeable fabric and a fresh layer of leveling sand. As you lay the pavers, adjust the sand beneath them as needed to achieve the desired height and level. The narrator points out that the pavers should be set approximately 1/4 inch high before compaction, as they will settle flush once tamped down. For areas that are too low, add more sand. Use a wood block and a hammer to gently tap pavers into place and achieve a level surface without damaging the pavers directly. This iterative process of laying, checking level, adjusting sand, and tapping is key to a stable and even patio.
Video Transcript
(1,541 characters)Hide
Video Transcript
(1,541 characters)Transcript may be auto-generated and contain errors.