Skip to main content

Prepare the Stable Base — Stabilize the Base Material

Beginner2 mins

Part of project

How to Level a Sinking Paver Step · Step 2 of 4

Helpful?

In this video

Once the area is cleared, compact the exposed subsoil thoroughly to create a stable foundation. Install a non-woven geotextile fabric over the compacted subsoil. This fabric acts as a separator, preventing the base material from mixing with the subsoil. Next, add a layer of A gravel in 3 to 4-inch lifts, compacting each lift with a plate compactor (e.g., Bartell BR1570). Ensure the A gravel is slightly moist (not too wet, not too dry) during compaction to achieve optimal density. Aim for a total compacted base thickness of 7 to 8 inches.

36.9K views259