Skip to main content

Prime the Staircase — Prime the Surface

Beginner2 mins

Part of project

Anti-Slip Steps · Step 3 of 6

Helpful?

In this video

Before starting to prime, keep in mind that you will need to avoid stepping on the stair surface until the product is fully dried. Plan your work schedule accordingly to ensure proper drying time and maintain access to other parts of your home if necessary. Next, apply Fresh Start High Hiding All-Purpose Primer to all surfaces you'll be painting. Begin at the top of the staircase and systematically work your way down. Use a small paintbrush for precise work on fine details and for cutting in along taped edges. A large paintbrush can be used for broader areas, while a paint roller is effective for priming spindles and handrails. After applying the primer, be sure to wait for it to fully dry according to the manufacturer's instructions before proceeding to the next coat.

81.8K views139
This Old House

2.3M subscribers

View Channel

FAQs

Do I absolutely need a high-powered pressure washer for cleaning, or can I just scrub the steps manually?

While manual scrubbing with the Shurhold 6 in. Marine Mate Stiff Brush and Klean-Strip Liquid Concrete Degreaser is an option, a pressure washer like the Westinghouse WPX 3800 psi significantly enhances cleaning efficiency. It ensures the removal of embedded dirt, loose paint, and grime, creating a superior surface for the DAICH Textured Bonding Primer and BEHR PREMIUM anti-slip paint to adhere to, which is crucial for durability.

What are the most important safety precautions to take when using the pressure washer and chemical degreaser?

Always wear appropriate personal protective equipment (PPE), including safety glasses, chemical-resistant gloves, and closed-toe shoes when operating the Westinghouse pressure washer or handling Klean-Strip Liquid Concrete Degreaser. Ensure adequate ventilation, especially in basement areas, and keep children and pets away from the work zone during chemical application and pressure washing to prevent accidental exposure.

Why does a 'beginner' project like anti-slip steps take two full days, and what factors might extend this timeframe?

The 2-day estimate accounts for crucial drying and curing times for each layer: degreasing, patching (with Quikrete or PC-Lumber Putty), priming, and applying two coats of BEHR PREMIUM anti-slip paint. High humidity, low temperatures, or extensive repairs that require longer setting times for patching compounds can all extend the project duration. Rushing these steps will compromise the final finish and durability.

What's the most common mistake DIYers make when applying anti-slip paint, and how can I avoid it?

The most common mistake is inadequate surface preparation, which leads to poor adhesion and premature peeling of the paint. To avoid this, thoroughly clean the steps with Klean-Strip Degreaser, pressure wash all debris, fill and sand all cracks and imperfections using Quikrete and PC-Lumber Putty, and apply DAICH Bonding Primer as directed. A clean, smooth, and primed surface is key to a long-lasting finish.