Skip to main content
Stesso
BrowseFeedExpertsMy Projects
Log inSign up
Stesso

Step 2 · Test Fit and Adjust First Piece of Molding

Hold the cut piece of shoe molding in place against the base of the first stair tread and against the riser. Check for any gaps or unevenness. If adjustments are needed, carefully trim the molding with the miter saw or a utility knife until it sits flush against both surfaces.

Stesso home
SearchSearchBrowseBrowseFeedFeedMy ProjectsMy Projects
Log inLog inSign upSign up

Step 2 · Test Fit and Adjust First Piece of Molding

Hold the cut piece of shoe molding in place against the base of the first stair tread and against the riser. Check for any gaps or unevenness. If adjustments are needed, carefully trim the molding with the miter saw or a utility knife until it sits flush against both surfaces.

Videos for this step

Dry Fit Tread and NosingTest Fit and AdjustTest Fit and Refine Cuts

Tools and Materials

← Project

How to Install Shoe Molding Along Stair Treads

Step 2 of 7·2.3 hr left

Measure and Cut Shoe Molding for First Tread
10 minutes4 items
2
Test Fit and Adjust First Piece of Molding
5 minutes3 items
3
Fasten First Piece of Shoe Molding
10 minutes4 items
4
Repeat for Remaining Stair Treads
60 minutes6 items
5
Fill Nail Holes
15 minutes3 items
6
Sand and Prepare for Finishing
15 minutes3 items
7
Apply Finish (Paint or Stain)
30 minutes4 items
Prev
Next
TermsPrivacySafetyLegal© 2026 Stesso, Inc.