Skip to main content

Step 5 · Allow First Coat to Dry

The drying time for the first coat will vary depending on temperature, humidity, and sealant type. Typically, it will take between 4 to 12 hours for the first coat to be dry to the touch and ready for a second application. Avoid walking on the driveway during this period. Check the sealant manufacturer's recommendations for specific drying times between coats.