Debris Clearing and Removal
2:20
51:10
8.8K views
At 2:20 in
Wrecking Ball VS concrete swimming pool
What happens here
After the main concrete structure has been sufficiently broken down, the Kubota SVL 75-2 skid steer enters the pool area to begin clearing the debris. The skid steer's bucket is used to scoop up the broken concrete pieces and load them into a waiting Freightliner dump truck for removal from the site. This process is repeated until all concrete debris has been cleared from the pool basin, ensuring the area is clean and ready for backfilling. The excavator assists in sorting larger pieces or moving debris to accessible locations for the skid steer.
Goal: Remove all concrete debris from the pool area.
Tools and materials
- Develon DX140LC Excavator Develon — Assisting with moving larger debris for easier skid steer access
- Freightliner Dump Truck Freightliner — Transporting concrete debris off-site
- Kubota SVL 75-2 Skid Steer Kubota — Scooping and loading concrete debris
What they say
(469 characters)Hide
What they say
(469 characters)Auto-generated from the video audio.