Active Demolition of Pool Structure
1:55
51:10
8.8K views
At 1:55 in
Wrecking Ball VS concrete swimming pool
What happens here
The excavator begins the active demolition of the concrete pool. The operator carefully uses the excavator's bucket to strike and break apart the concrete walls and floor of the pool. The operator also uses a large, rounded piece of concrete, referred to as the 'demolition boulder,' by dropping it repeatedly onto the pool's remaining concrete sections. This method is effective in smashing the thick concrete into smaller, manageable pieces, creating significant dust in the process. This stage is crucial for reducing the pool's structure into debris that can be handled for removal.
Goal: Break the concrete pool into manageable debris.
Tools and materials
- Demolition Boulder N/A — Smashing large concrete sections of the pool
- Develon DX140LC Excavator Develon — Breaking concrete with its bucket and dropping the 'demolition boulder'
- Dust Mask — Protecting respiratory system from concrete dust
- Safety Glasses N/A — Protecting eyes from flying debris and dust
What they say
(596 characters)Hide
What they say
(596 characters)Auto-generated from the video audio.