What happens here

The video demonstrates the ongoing process of laying blocks and backfilling, including the installation of geotextile grid. The grid appears 'higgedly-piggedly' when initially laid out on the ground, but its purpose is crucial for wall stability. The expert clarifies that for engineered retaining walls, the engineer must specialize in retaining wall construction and use CAD-aided design software to calculate specific grid lengths. These lengths are not uniform and depend on three critical factors: the height of the retaining wall, the type of soil behind the wall (requiring a soil sample for analysis), and the surcharge (load) the retaining wall will experience. Surcharge can come from a hill or a structure. It is emphasized that the installer is liable for wall failure for up to 8 years, even without a warranty, making proper adherence to design essential.

Goal: Recognize the proper placement and function of geotextile grid in engineered retaining walls, and how surcharge (loads behind the wall) dictates grid lengths and overall wall design.

Tools and materials

  • Geotextile Grid
  • Pinning System (for blocks)
  • Red Bar
  • Retaining Wall Blocks
  • Rubber Mallet (Husky) Husky

What they say

Hide

you're supposed to have two feet of uncontrolled fill going in behind your retaining wall no way if you don't pack that two foot that goes behind the drainage zone you're going to have problems and so we always compact it and when i've questioned the engineers they've never yet come up with a good solution and speaking of engineers if you are going to build an engineered retaining wall you can't just get any old civil engineer i'm going to recommend you get somebody that not only understands retaining wall construction but also has specialty programs designed to help you build that retaining wall meaning that there is cad aided designs that will allow you to allow an engineer to design the specific grid lengths for the retaining wall here's where it gets interesting even though you got a six foot let's say you got a six foot retaining wall not all of your grid lengths behind that retaining wall are going to be equal distance or equal length behind the retaining wall it'll depend on the surcharge and the surcharge means the load that is placed behind the retaining wall and typically the surcharge is going to come from two different forms or functions one is going to be a hill the other one is going to be a structure and then the grid lengths are dependent on the le the height of the retaining wall the type of soil that is going behind the retaining well that's a critical element to make sure you have a soil sample and then the surcharge that the retaining wall is going to experience all of these three things tie together to actually make a properly engineered retaining wall and that's why i back up to say you don't want just any old civil engineer you want to make sure you get somebody that understands retaining wall construction because you as the installer no matter what happens if you screw that wall up you're liable for it for eight years that's right if they find a fault in you don't even have to give a warranty if there's if it's legally you find a fault in your retaining wall because the