Layering Blocks and Geotextile Grid Efficiently
At 9:09 in
WHY Retaining wall Engineers ARE ALL WRONG!!
What happens here
The traditional method of laying one block course, backfilling, then compacting, is deemed too time-consuming. Instead, the video demonstrates laying four courses of retaining wall blocks before backfilling. This is possible because geotextile grid is placed every four courses, allowing for a more efficient workflow. The grid is temporarily flipped over the face of the wall. Once the next four courses are laid and backfill is brought up to the grid level, the grid is then 'slapped' down onto the dirt, securing it, and enabling backfilling up to the next block course. This strategic layering significantly speeds up the building process, especially crucial for commercial projects.
Goal: Optimize the installation process by laying multiple courses of blocks before backfilling, leveraging the structural benefits of geotextile grid to accelerate construction.
Tools and materials
- Geotextile Grid
- Retaining Wall Blocks
What they say
(1,634 characters)Hide
What they say
(1,634 characters)Auto-generated from the video audio.