Skip to main content

Framing Wall Studs and Sheathing (Ground or On-Site)

0:21
2:59
4.1M views

At 0:21 in

What keeps your house standing? Learn how to build and how failures are prevented #build #structure

What happens here

Lay out the wall studs with their crown (the slight convex bend in the lumber) facing up. This ensures the wall will be straighter when loaded. Flush up the face of each stud with the edge of the plates, then use a framing nailer to secure the studs to both the bottom and top plates. The video demonstrates sheathing the wall on the ground, which makes the wall heavier but provides better structural integrity before lifting. Alternatively, sheathing can be applied after the wall is stood up, which is less heavy to lift but more work at height.

Goal: Assemble the wall frame by nailing studs to plates and apply sheathing.

Tools and materials

  • Extension Ladder Little Giant — Accessing higher areas if sheathing is applied after the wall is stood up
  • Framing Nailer — Nailing studs to plates and sheathing to studs
  • Lumber — The vertical structural members of the wall
  • Oriented Strand Board — Adding rigidity and shear strength to the wall frame

What they say

Hide

Separate our plates, chalk a line, pin it down at this angle, so it can't kick out. If we don't, the bottom can slide out. Lay out your studs crown facing up. Flush up the face of your stud. Remember, don't nail your hand. Sheathing on the ground makes walls heavy, but sheathing after can be a lot more work. Regardless of method, there's always an easier way. You have your roof and rafter, sheathing, double top plate, your bottom

Auto-generated from the video audio.