For wall openings (windows or doors), first, measure and verify the required rough opening dimensions. Then, build the header by nailing together pieces of lumber, often with a spacer to match wall thickness. Install the header into the wall opening. A header alone will not provide sufficient support; it must rest on vertical 'jack studs' (also called trimmer studs) that transfer the load down to the bottom plate. Without jack studs, the header relies solely on the nails into the king studs, which can fail under load. After the header is installed, mark out the openings on the sheathing and cut them out with a circular saw.

Goal: Create strong and correctly sized openings for windows and doors.

Tools and materials

  • Chalk Line — Marking opening cuts on sheathing
  • Circular Saw Makita — Cutting out sheathing for openings
  • Framing Nailer — Assembling headers and fastening them into the wall
  • Lumber — Constructing the opening frame
  • Measuring Tape — Checking rough opening dimensions
  • Sledgehammer Husky — Demonstrating the weakness of a header without jack studs

What they say

Hide

sheathing, snap a line. Use this sheet down on the other side and nail down your sheet. For wall openings, check the required rough opening and build your header. If you just nail a header up, but if you install jacks, give the headers support and mark out your openings. Before we stand up walls, screw in a side brace. >> [snorts] >> So, now when you lift the wall, we can adjust our brace. Nail this off.

Auto-generated from the video audio.