Remove Topsoil for Patio Base

9:34
24:29
64.4K views

At 9:34 in

we find BURIED Utilities the WRONG way!

What happens here

The area designated for the new paver patio is carefully marked with orange spray paint. A skid steer is then used to scrape off and remove the existing grass and organic topsoil. It is critical during this phase not to over-excavate or cut too deep into the sub-base material. Over-excavation of organic soil is necessary to ensure 100% compaction of the non-organic structural fill. If too much non-organic sub-base is removed, it must be carefully replaced in lifts and compacted to achieve the required density, which is a labor-intensive and time-consuming process. The removed organic material is piled for potential reuse in other landscaping areas, promoting site material balance.

Goal: The patio area is marked, and a skid steer removes grass and organic topsoil to prepare the base for proper compaction, preventing over-excavation.

Tools and materials

  • Orange Spray Paint
  • Shovel
  • Skid Steer Loader (Kubota SVL 65-2)
  • Organic Topsoil

What they say

Hide

therefore the fabric in this case really isn't an absolute necessity during this phase of the project we want to be very careful that we don't over excavate or cut our sub base material out too deep if by chance we do happen to cut too deep we can't just put the material back in like nothing happened we've got to actually place it in lifts and compact it to make sure that we have a hundred percent compaction below this new paper patio that's going in so by being a little extra careful during this step it will save us a lot of potential work down the road [Music] now whoa whoa whoa we can't just cut to any measurement because that's the right measurement we've also got to take into account that we've got to remove all of the organic material so for example let's say we know we've got to cut eight inches down to get the proper amount of base material in but we still have black or organic material eight inches down it doesn't mean our job is done then we have to keep going to remove all of that organic material and knows under no circumstances are we allowed to put a paper patio on any kind of black organic or non-structural fill soil