Earthwork and Grade Establishment

8:15
24:29
64.4K views

At 8:15 in

we find BURIED Utilities the WRONG way!

What happens here

Using the Kubota skid steer, carefully excavate the patio area to the specified depth, ensuring all black organic soil is removed to expose stable brown structural soil or bedrock. Avoid over-excavation to prevent the need for extensive re-compaction. Simultaneously, use the skid steer to dig a drainage swale (a shallow, broad channel) along the perimeter of the work area, especially where stormwater runoff from hard surfaces like roads may impact the property. Install riprap (large, angular rocks) within the swale, carefully arranging them to create a stable, erosion-resistant channel. Where possible, use existing bedrock as a natural foundation for the riprap, reducing the need for additional geomembrane fabric.

Goal: Excavate to stable soil, establish the correct grade, and install drainage solutions.

Tools and materials

  • Kubota SVL 65-2 Skid Steer
  • Riprap (Large Rocks)
  • Shovels and Rakes

What they say

Hide

stumps you'll notice that this street has no curb and so all of the water that hits that street dumps directly onto the customer's property and then because it's down a hill goes right into their new structure that they just built is going to dump right onto the patio that they want us to put in and we've got to put in a drainage swale to control that we install the drainage swale as the very first step that way if we get any torrential downpours during the course of construction we're not going to end up with a complete washout now i'm going to jump in here because i'm guessing more than a few of you are asking why don't you have fabric below that rip rap well because we're right on bedrock so we are actually laying rip rap and bedrock on a foundation of your bedrock therefore the fabric in this case