Base Preparation and Compaction

13:15
24:29
64.4K views

At 13:15 in

we find BURIED Utilities the WRONG way!

What happens here

Begin preparing the base for the paver patio and walkways. Use a dump truck or skid steer to deliver and spread a layer of structural fill soil, such as 'recycled Class 5' (road millings, which are crushed asphalt and aggregate). This material consists of various sized pieces from 3/4 inch down to fines, packing down hard like concrete. Use the skid steer for rough spreading of the material, then use hand tools (shovels, rakes) for precise leveling. Once the base material is spread, compact it thoroughly using a Tomahawk plate compactor. Repeat this process, laying down material in lifts and compacting each layer to achieve 100% compaction, which is critical for preventing settling and ensuring the long-term stability of the paver installation.

Goal: Create a stable and properly compacted base for the paver patio and walkways.

Tools and materials

  • Dump Truck
  • Kubota SVL 65-2 Skid Steer
  • Shovels and Rakes
  • Tomahawk Plate Compactor
  • Recycled Class 5 Material

What they say

Hide

[Music] next on this project the customers also requested that we flank the paper patio with two natural stone sidewalks which are more of just natural landscape features to tie everything together than actual structural physical sidewalks it's more for aesthetics than it is for use but we still want to put enough bass down that it won't move our sub base material is recycled class 5 and what this is it's road millings that has been pulverized and crushed the largest pieces are three-quarter inch in