Initial Site Regrading and Soil Relocation
At 2:14 in
Water is wrecking my house! Can Regrading fix that?!? Start to finish in 4 k
What happens here
The first active step is to begin moving existing soil to correct the grade. An ASV RT-75 skid steer equipped with a grapple bucket is used to cut down the elevated areas directly adjacent to the building's foundation. This initial excavation aims to create a lower grade close to the house, ensuring water will flow away. The removed soil is then strategically moved to create an elevated parking pad further away from the building, demonstrating the principle of balancing the site by utilizing existing materials and avoiding the need for off-site hauling or bringing in new dirt.
Goal: Lower the grade near the foundation and create an elevated parking area.
Tools and materials
- ASV RT-75 Skid Steer ASV — Excavating and moving large quantities of soil
- Grapple Bucket — Scooping and moving soil and potentially other debris
- Safety Glasses — Eye protection during machine operation