Lay Subsequent Courses and Backfill
At 8:45 in
Wall FAILURE about to hit house-Plus we pull a mean one! START to FINISH 4 k Wall build
What happens here
The team continues laying subsequent courses of retaining wall blocks, often working in pairs for efficiency. One worker hands blocks, and the other places and levels them. After several courses are laid, the skid steer is used to carefully backfill the area behind the wall with soil, consolidating the structure. The backfilling is done incrementally to avoid placing too much pressure on the new wall. Compaction of the backfill is also performed using a plate compactor. The video shows the finished retaining wall with its stepped design, extending from under the porch and following the natural grade.
Goal: Complete the retaining wall structure and secure it with backfill.
Tools and materials
- Level — Checking level of blocks
- Plate Compactor — Compacting backfilled soil
- Rake — Spreading backfill
- Retaining Wall Blocks — Completing the wall courses
- Rubber Mallet — Adjusting blocks for level
- Skid Steer Loader ASV RT-75 Posi-Track — Backfilling with soil
- Soil — Backfilling behind the retaining wall