What happens here
As the wall progresses, a drainage pipe (4-inch solid piece of pipe) is installed behind the blocks. This pipe is specifically for managing rainwater from the house's downspout, not for the retaining wall's general drainage. A worker is shown connecting the flexible drainage pipe. Geogrid (or a similar reinforcement material) is laid over the installed blocks and extended back into the excavated area to tie the wall into the hillside for added stability.
Goal: Establish a dedicated drainage system and reinforce the retaining wall structure.
Tools and materials
- 4-inch Solid Drainage Pipe — Routing downspout water away from the wall
- Connector — Connecting sections of the drainage pipe
- Geogrid — Reinforcing the retaining wall and tying it into the hillside