What happens here

Begin by excavating the area where the retaining wall will be constructed, ensuring proper depth for burying the initial courses of blocks. Lay down a layer of geotextile fabric along the base and side of the excavation to prevent soil migration and improve stability. Spread a layer of gravel for the wall's footing and compact it thoroughly using a plate compactor.

Goal: This step involves preparing the site by excavating the area for the retaining wall, laying down geotextile fabric and initial gravel, and compacting the base to create a stable foundation.

Tools and materials

  • Bobcat 325 Excavator
  • Geotextile Fabric
  • Gravel
  • Plate Compactor (Wacker Neuson DPU2550H)

What they say

Hide

[Music] all right you guys we're gonna have a busy two weeks because we are going to take this project from start to finish this is an 11 foot tall retaining wall on a steep slope we're gonna wrap this job up this week and then next week we're going to dive into a patio that we're putting on top of this retaining wall and we're going to show you that series back to back to back so you'll be able to watch this job go from where