Initial Excavation and Base Preparation
0:00
17:09
365.6K views
At 0:00 in
Turning a STEEP Hill into a Flat yard #1
What happens here
Begin by excavating the area where the retaining wall will be constructed, ensuring proper depth for burying the initial courses of blocks. Lay down a layer of geotextile fabric along the base and side of the excavation to prevent soil migration and improve stability. Spread a layer of gravel for the wall's footing and compact it thoroughly using a plate compactor.
Goal: This step involves preparing the site by excavating the area for the retaining wall, laying down geotextile fabric and initial gravel, and compacting the base to create a stable foundation.
Tools and materials
- Bobcat 325 Excavator
- Geotextile Fabric
- Gravel
- Plate Compactor (Wacker Neuson DPU2550H)
What they say
(430 characters)Hide
What they say
(430 characters)Auto-generated from the video audio.