Continue Stacking and Reinforcing
At 12:45 in
Turning a STEEP Hill into a Flat yard #1
What happens here
Continue building the wall by repeating the previous steps: lay additional courses of segmental blocks, secure new layers of geogrid, and backfill with appropriate drainage and structural fill. Maintain proper alignment and levelness throughout the process. The 'dry stacking' method allows for up to four courses of blocks before requiring backfill. Always ensure the geogrid is properly integrated and compacted within the backfill layers. Utilizing solid blocks with pin connections (like Versa-Lok) provides superior inter-block stability compared to blocks relying solely on lips or gravity. This iterative process builds an engineered retaining wall designed for long-term stability and load-bearing capacity.
Goal: This final step involves repeating the process of stacking blocks, laying geogrid, and backfilling with drainage and structural fill in lifts until the desired wall height is achieved, ensuring all connections are solid and stable.
Tools and materials
- Compactors (Plate and Roller)
- Drainage Aggregate (Gravel)
- Geogrid Fabric
- Hammer
- Rakes and Shovels
- Skid Steer Loader (ASV RT-75)
- Structural Fill Soil
What they say
(2,494 characters)Hide
What they say
(2,494 characters)Auto-generated from the video audio.