Skip to main content

Construct the Main Staircase

2:32
13:30
11K views

At 2:32 in

TURNING a staircase 4K

What happens here

The main staircase is constructed in the lower garage area. This involves framing the stringers (the sides of the stairs), installing individual risers (vertical components) and treads (horizontal stepping surfaces), and building a small landing at the top of the initial run. The stairs are designed to have a switchback configuration, changing direction to fit the available space. The framing is securely attached to the existing concrete block wall and floor joists.

Goal: Build and install the structural components of the staircase.

Tools and materials

  • Circular Saw — Cutting lumber for stringers, risers, and treads
  • Cordless Drill DeWalt — Driving screws and fasteners
  • Hammer — Minor adjustments and securing components
  • Level — Ensuring horizontal and vertical alignment of stair components
  • Lumber — Framing the stringers, risers, and treads of the staircase
  • Safety Glasses — Eye protection
  • Speed Square — Marking accurate cuts for stair components
  • Construction Screws — Fastening stair components together

What they say

Hide

[Music] [Applause] [Music] hello [Music] [Applause] [Music] somebody [Music]

Auto-generated from the video audio.